Yongbiao Construction logo
YONGBIAOCONSTRUCTION
MEP / Cleanrooms

Cleanrooms that pass validation.

Classified spaces proven by measurement — particle counts, recovery time and pressure differentials.

ISO 6–8
Classifications
Room by room
Pressure testing
Third party
Particle count
Documented
Recovery test

Cleanroom scope

Classified spaces proven by measurement.

Cleanroom classes

Cleanrooms designed to the classification the process actually needs.

  • ISO 6–8
  • Class 100–100,000

FFU and MAU

FFU and make-up air units sized for particle control and pressure cascade.

Pressure cascade

Pressure differentials set and proven room by room.

HVAC

Temperature and humidity control for processes sensitive to both.

Validation

Particle counts and recovery tests witnessed and documented.

Monitoring

Monitoring points integrated with the client's BMS where required.

Delivery sequence

  1. 01
    Requirement

    Process, particle class and air-change rate agreed in writing.

  2. 02
    Design

    Airflow modelling and equipment selection before construction.

  3. 03
    Construction

    Panel, ceiling and air-handling installation to the approved detail.

  4. 04
    Validation

    Particle count, recovery and pressure tests witnessed and recorded.

Send your cleanroom requirement

Send drawings, a bill of quantities or just a site address. We reply within one business day with an indicative scope, schedule and budget range.